Our Projects

Operational Excellence in Large-Scale Commercial Electrical Projects

Our Work

Warehouses

Amazon AVP 9

This extensive project for Amazon’s XL Warehouse & Distribution Facility involved providing and installing multiple utility services, including (2) 3000a and (1) 2500a exterior utility service. It featured the installation of (2) 3000a switchboards, (1) 2500a NEMA 3R switchboard, and all necessary duct banks and transformer vaults.

Manufacturing

Cardinal LG

This 200,000 sq. ft. project, classified as B Business – F-2 Factory – S-2 Storage, included installing a 1200amp 12kV Load Interrupter Switch, medium and low voltage cabling, duct banks, low voltage switchboards, 125kW Emergency Generator, comprehensive lighting, wiring for HVAC, Cat 6 network cabling, and a full paging system.

Power Plants

Lackawanna Energy Center

Working alongside Kiewit & Invenergy, this project involved the installation and testing of all 15kV and 35kV medium voltage cabling for a 1,485MW natural gas power plant. Additionally, the project included the provision and installation of both single mode and multimode fiber optic cabling, along with fusion splicing and testing for all fiber optic cables.

Utilities

PPL Electric

This project involved setting a pad for a 1500kW outdoor generator and installing all necessary duct banks from the generator to the ATS and from the existing switchgear to the ATS. It included intercepting and relocating the existing incoming electrical service to the ATS, providing and installing all cabling, and performing termination and testing of all cabling.

Power Plants

Talen Energy

In coordination with Cumulus Data, this new 12kV campus distribution loop on approximately 178 acres, the project involved installing duct banks from substations to 35kV pad-mounted transformers, installation of transformer vaults and pads for PME switches, and completing all necessary excavation, backfill, and restoration.

Data Centers

Terawulf – Nautilus Bldg. B

This 50MW mining facility project included setting and installing (56) owner-supplied NEMA 3R switchboards, wiring from (28) pad mount transformers to switchboards, and installing 17,000’ of cable tray and 82,000’ of tray cable from switchboards to (880) PDUs. 

Got an Electrical Project?

Copyright © 2026 Joyce Electrical, Inc. All rights reserved.